Initial plan was to engage Winson from Dot 3 (previously from Unimax) to do our renovation... but conflicts soon arised and we find him not up to our expectations... but since we have already paid him a $200 deposit.. we told him that we will only let him do half of our work and the other half we will find others to do... but his attitude got worst and said he would rather we not engage him at all.. well that's even better for us... because I am very unpleased and pissed off with his attitude and his unprofessional...
So I started sourcing around for more quotations... finally decide to engage a contractor instead... since I have already gotten the 3D drawings from Winson.. talking about this.. the 3D drawings weren't even what I wanted.. so I can only use it as a guide... Winson didn't contribute any ideas at all.. all the ideas were from us... then what is the use of engaging an ID... might as well get a contractor...
Got a contractor contact through my hubby's uncle... his name is Ah Liang... he is my hubby's uncle longtime friend... so can be trusted, won't mark up too high and he has been in this line for about 20 yrs... so very experienced... can sense it when telling him about my expectations and requirements...
happy to get him to do our renovation... gave us a very good price... almost $3K savings when compared to Winson's quotation... because we are not getting a renovation loan.. so every single cent counts...
Quotation details as follows:
A Demolishing Works
1. To supply labour & material to dismantle existing door & frame at WIW - $80
2. To supply labour & material to dismantle existing door at Entertainment Room - $40
3. To supply labour & material to open existing door entrance at MBR - $100
4. To supply labour & material to dismantle existing wardrobe at 3 bedrooms - $350
5. To supply labour & material to dismantle existing shower screen at MBR - $50
6. Haulage for building material & removal of debris - $250
B Wet Works
1. To supply labour & material to lay (600 x 600) quartz homogenous ($16.50 & below) feature wall tile finish at side of kitchen entrance - $1000
2. To supply labour & material to seal up hollow block wall at WIW - $180
3. To supply labour & material to replace laminate floor after hacking of MBR - $250
C Tempered Glass
1. To supply labour & material to install (10ft x 7ft) 1 panel sliding 10mm tempered sandblasted glass c/w aluminium top track at Entertainment Room - $850
2. To supply labour & material to install pelmet in laminate finish to cover top track - $180
3. To supply labour & material to install 1 fix panel 10mm tempered clear glass at MBR
D False Ceiling Works
1. To supply labour & material to install false ceiling at Foyer - $120
2. To supply labour & material to install false ceiling at Bar Counter area - $120
3. To supply labour & material to install design drop down L box light holder at living area - $650
4. To supply labour & material to install false ceiling at Dining area - $350
5. To supply labour & material to install half false ceiling c/w drop down L box light holder at Entertainment Room - $400
6. To supply labour & material to install square false ceiling c/w drop down L box light holder at WIW - $480
7. To supply labour & material to install false ceiling c/w drop down L box light holder at MBR - $480
8. To supply labour & material to construct partition wall at fridge area - $280
E Customised Furniture
Foyer & Fridge area
1. Design & fabricate (5.5ft) full height shoe cabinet in selected laminate finish with ABS trimming - $1090
2. Design & fabricate (2.5ft) top cabinet above fridge in selected laminate finish with ABS trimming - $320
Bar Counter area
1. Design & fabricate (6.5ft) L shaped bar counter in selected laminate finish with ABS trimming - $500
2. To supply labour & material to install square 10mm tempered sandblasted glass at bar counter top - $270
3. To supply labour & material to install stainless steel bar c/w 10mm tempered clear glass at ceiling area above bar counter - $290
Passage way
1. Design & fabricate (6.5ft) feature wall c/w tic tac door in selected laminate finish with ABS trimming - $980
Entertainment Room
1. Design & fabricate (11.5ft) feature wall in selected laminate finish with ABS trimming - $1680
2. Design & fabricate (5.5ft x 8.5ft) cushion at TV area - $1480
3. Design & fabricate (16.5ft x 2ft) cushion L shaped at bay window area - $890
MBR
1. Design & fabricate (11ft x 2ft) cushion c/w laminate finish at bay window area - $690
F Other Works
1. Lay floor protection with cardboard roll - $180
2. Renovation permit - FOC
3. Project management & supervision - FOC
Total price: $14,930 - $430 discount = $14,500